Industrial Wood Biomass Rice Husk Fired Steam Boiler Technical Parameters
Boiler model | SZL2 | SZL4 | SZL6 | SZL8 |
Rated Evaporation | MW | 2 | 4 | 6 | 8 |
Rating pressure | MPa | 1.25(2.5) | 1.25(2.5) | 1.25(2.5) | 1.25(2.5) |
Feed Water Temp | °C | 20 | 20 | 20 | 20 |
Rated Steam Temp | °C | 194(226) | 194(226) | 194(226) | 194(226) |
Active Grate Area | m3 | 3.1 | 4.6 | 7.3 | 10.4 |
Weight | T | 20(25) | 28(29) | 37(42) | 52 |
Dimension | mm | 5960x2960x3462 | 6510x3130x3462 | 7830x3346x3462 | 8200x3346x3462 |
Industrial Wood Biomass Rice Husk Fired Steam Boiler Standard Accessories
Boiler accessories |
1. FD fan | 1 set |
2. ID fan | 1 set |
3. Electrical control cabinet | 1 set |
4. Valves&instruments | 1 set |
5. Fire grate reducer | 1 set |
Boiler room equipment |
6. Water pump | 1 set |
7. Steam header | 1 set |
8. Chimney | 1 set |
9. Gas duct | 1 set |
10.Economizer | 1 set |
11.Fuel feeder | 1 set |
12.Slag remover | 1 set |
13.Dust catcher | 1 set |
14.Water soften equipment | 1 set |
We will also provide the wet scrubber ,air preheater, bag filter or other things according to customer's requirements. |
FAQ
Q: How can you get the best price quickly?
A: As soon as the steam capacity / thermal power and pressure are told, we will make the detail price list at once.
Q: Why should you believe our quality?
A: 58 year experience, founed since 1976; Chinese-government appointed Grade A Boiler Manufacturer.
With ISO9001, CE certificates.
Quality control system: Include 8 subsystems, design, techonics, welding, inspection, non-destructive testing, heat treatment, materials physics and chemistry inspection, device management Each process will be strict supervised. 5 process quality point, Raw material inspection, product specimen, NDT, hydrostatic test, Heat treatment. The products must be inspected by third party before delivery.
Q: What about the installation?
A: After you receive the boiler, we will guide you to make some preparation for installation; If necessary, our expert will fly to your local place in 72 hours. The experts will responsible for guiding installation,training, trial operation.